1. The AGV project of Shangrao Hanteng Automobile General Assembly Workshop in Jiangxi Province mainly uses AGV to complete the transfer of product materials in different workshops; including the first line of interior decoration, the second line of interior decoration, the chassis line, and the door line of the assembly workshop; using the intelligent transfer of AGV, the SPS trucks are distributed to each production line station, and the empty trucks are recycled;
2. Summary of the difficulties of the project:
The main difficulty in transportation of this project is that it requires fast distribution and strong timeliness. If the distribution is not timely, it will affect the production of the entire production line and affect the overall production capacity.
3. Functions and benefits provided by CASUN AGV: After using CASUN AGV, manual handling is replaced. Ensure the real-time supply of materials, greatly improve the degree of intelligent manufacturing and transportation efficiency, and greatly improve production efficiency.
Manual handling of such materials is long, time-consuming, frequent, and labor-intensive.
The docking frequency is fast, the error rate is high during the transshipment process, and the non-set distribution has a large installation error rate.
There are many kinds of goods on the line side, the demand is large, the space is limited, and the arrangement is messy, which affects the appearance and increases the time for finding goods.
In order to meet the fast-paced production efficiency, the demand for porters is large and the working hours are long, which in turn leads to high salary costs and high management costs.
1. The project uses 23 one-way latent traction AGVs in the first phase, 5 one-way latent traction AGVs in the second phase, 8 sets of automatic charging columns, 3 sets of on-line mechanisms, 3 sets of off-line mechanisms, 110 sets of SPS trucks, and 1 set of AGV central management control system.
2. The material is automatically ordered through the system, and the AGV continuously works for 24 hours one day.
3. The tempo requirement is 30JPH.
Reduce the number of logistics and distribution personnel and offline and offline personnel, and each production line can save 3-5 people.
Reduce the number of logistics and distribution personnel and offline and offline personnel, and each production line can save 3-5 people.
The SPS table setting distribution mode greatly reduces material distribution errors and assembly errors.
Seamless connection between processes through AGV to improve factory intelligence.