1. Mainly equipped with high-end MT projects supported by smart phones, it is an MT exhibition venue for smart phone application requirements. Using the intelligent support of the material handling warehouse, dismantling, docking with the connection, accepting low-level delivery, accepting.
2. Difficulties of the project: connect the precise guarantee of Mars Precision and AGV cooperation.
3. CASUN AGV: By using the functions provided by CASUN AGV, artificial anti-corrosion is replaced. The unmanned operation of the whole line greatly improves the efficiency of intelligent manufacturing and transportation, and ensures the timeliness of logistics and production lines with high efficiency.
The workshop where the project is located is a dust-free workshop, which has high requirements for the dust-free treatment of the truck body.
Manual handling of such large materials is time-consuming and difficult. The technological process is diverse, and the error rate during the transfer process is high, which in turn leads to low production efficiency.
In order to meet the fast-paced production efficiency, the demand for porters is large and the working hours are long, which in turn leads to high salary costs and management costs.
1. The project uses 1 AGV with two-dimensional QR code backpack chain, 1 set of automatic charging poles, 2 sets of lifting docks, etc.
2. Through the docking with the customer system, the material is ordered independently, and the optimal transportation route is intelligently planned.
The AGV vehicle is small and docked with the lifting dock. The lifting dock has a floating function, which can realize the docking of machines of different heights.
The AGV intelligent control system is connected with the MES system to automatically generate material transfer tasks, and can intelligently plan the optimal path to reduce invalid walking and improve operation efficiency.
Deploy in one step without expensive infrastructure and without waiting for downtime. After the equipment arrives at the site, it can be quickly online and put into production within 7 days.
facilitate the process, save labor costs and reduce labor burdens.
99% of the production demand rate for the entire line of transport is met in time.